PUBLIC NOTICE

Pursuant to the Wyoming Administrative Procedure Act and the Wyoming Public Service Commission’s (Commission) Rules, notice is hereby given that a public hearing is scheduled regarding the complaint filing by Boswell Wind Project I, LLC, Boswell Wind Project II, LLC, Boswell Wind Project III, LLC and Boswell Wind Project IV, LLC (collectively referred to as the Boswell Wind Companies or the Complainant) against Rocky Mountain Power (RMP of the Company). The public hearing is set to commence on Tuesday, February 26, 2019, at 9:00 a.m., in the Commission’s hearing room located at 2515 Warren Avenue, Suite 300, in Cheyenne, Wyoming.

RMP is a public utility as defined in Wyo. Stat. § 37-1-101(a)(vi)(C), subject to the Commission’s jurisdiction pursuant to Wyo. Stat. § 37-2-112.

On October 15, 2018, Boswell filed a formal complaint against RMP regarding inconsistencies with the interconnection dates set forth in the Complainant’s Qualifying Facility Large Generator Interconnection Agreements (QFLGIAs) and the commercial online dates found in the Complainant’s power purchase agreements (PPAs).

All interested persons are encouraged to attend the public hearing which will be conducted in accordance with the Wyoming Administrative Procedure Act and the Wyoming Public Service Commission Rules and Special Regulations. Interested persons may appear and be heard, either in person or through counsel, as provided by Commission Rule.

The Commission’s hearings are open to all persons. If you wish to attend the hearing and you require reasonable accommodation for a disability, please contact the Commission at (307) 777-7427 (Voice or TTY) in Cheyenne during regular business hours or write them at 2515 Warren Avenue, Suite 300, Cheyenne, Wyoming 82002, to make arrangements. Communications impaired persons may also contact the Commission by accessing Wyoming Relay (TTY) by dialing 711. Please mention Docket No. 20000-541-EC-18 (Record No. 15115) in your correspondence. If you wish to listen to the hearing scheduled in this matter go to http://psc.wy.us at the appropriate time and follow the instructions to connect to the hearing.

Dated: February 8, 2019.

Public Notice #7779 published in the Pinedale Roundup on February 15, 22, 2019

PUBLIC NOTICE

Pursuant to the Wyoming Administrative Procedure Act and the Wyoming Public Service Commission’s (Commission) Rules and Regulations, notice is hereby given of the Application of Rocky Mountain Power (RMP or the Company) for a Certificate of Public Convenience and Necessity (CPCN) to remove existing wind turbines, construct new wind turbines and update collector lines at its Foote Creek wind energy site, as more fully described below:

RMP is a public utility, as defined in Wyo. Stat. §37-1-101(a)(vi)(C), subject to the Commission’s jurisdiction pursuant to Wyo. Stat. §37-2-112.

On February 5, 2019, the Company submitted an Application together with testimony, and exhibits requesting the Commission grant a CPCN to remove existing wind turbines, construct new wind turbines and update collector lines at its Foote Creek wind energy site.

Specifically, RMP requests the Commission grant a CPCN to [i] construct approximately 12 new wind turbines and replace the Company’s 68 existing wind turbines; [ii] update existing 34.5 kilovolt (“kV”) collector lines; and [iii] other project site upgrades including a switchgear and controls enclosure and limited road realignments necessary for access to the new turbine locations, at the existing Foote Creek I Wind Energy Facility1 (the Project).

The preliminary estimated total cost for installation of the new turbines is approximately $60.0 million, and the preliminary estimated total cost for removing the 68 existing turbines is approximately $4.0 million. These values may change as final construction plans are developed and turbine supply and construction contracts are executed.

The Company intends to finance the Project through its normal internal and external sources of capital, including net cash flow from operating activities, public and private debt offerings, the issuance of commercial paper, the use of unsecured revolving credit facilities, capital contributions, and other sources.  The financial impact will not impair the Company’s ability to continue to provide safe and reliable electricity service at reasonable rates.  The Company is not requesting ratemaking treatment at this time.

Construction of any necessary new roads, turbine foundations, and upgrades to the existing collector system will begin in the summer of 2019.  Erection of the new turbines will begin as early as site conditions allow in the spring of 2020 in order to avoid extreme winter weather and high wind conditions.  Construction of the new turbines is estimated to be complete by October 2020 and commercial operation of the new turbines before January 1, 2021.

The Company also requests authority to continue to recover any remaining book balance of its ownership interest in the turbines that will be replaced as included in the 2018 depreciation study in Docket No. 20000-539-EA-18. 

According to RMP, the Project is a time-limited opportunity that provides benefits to customers by [i] increasing energy production with larger, more efficient turbines; [ii] reducing operating costs; and [iii] qualifying the new wind turbines for federal production tax credits, which expire 10 years after a facility’s commercial operation date. To achieve the full production tax credit benefits, the Company must complete the Project by the end of 2020.

This is not a complete description of RMP’s Application.  Interested persons may inspect the entire Application at RMP’s Wyoming offices and at the Commission’s offices in Cheyenne, Wyoming, during regular business hours.  The Application may also be reviewed on line at http://www.pacificorp.com.

Anyone desiring to file a public comment, statement, protest, intervention petition or request for a public hearing in this matter must file with the Commission in writing on or before February 22, 2019.  Any intervention request filed with the Commission shall set forth the grounds of the proposed intervention or request for hearing as well as the position and the interest of the petitioner in this proceeding.

If you wish to intervene in this matter or request a public hearing that you will attend, or you wish to file a public comment, statement, or protest, and you require reasonable accommodation for a disability, please contact the Commission at (307) 777-7427, or write to the Commission at 2515 Warren Avenue, Suite 300, Cheyenne, Wyoming 82002, to make arrangements. Communications impaired persons may also contact the Commission by accessing Wyoming Relay at 711. Please mention Docket No. 20000-553-EN-19 (Record No. 15202) in your communications.

Dated:  February 8, 2019.

Public Notice #7780 published in the Pinedale Roundup on February 15, 22, 2019

Notice is further given that the following applicants filed renewal applications for the period April 1, 2019 through March 31, 2020 for a Microbrewery Liquor License in the Office of the Town Clerk of Pinedale, Pinedale, Wyoming.  The date of filing, the names of said applicants and the street address which the applicants desire to use as the place of sale are set forth below as follows:

Date of Filing December 05, 2018

Applicant Wind River Brewing Company, Inc., DBA Wind River Brewing Company Address  402 West Pine

Protests, if any there be any against the issuance of each and every license will be heard at the hour of 6 P.M. on the 25tth day of February, 2019 in the Sublette County Commissioner’s Room, 21 S. Tyler, Pinedale, Wyoming.

Public Notice #7784 published in the Pinedale Roundup on February 15, 22, 2019

Notice is further given that the following applicants filed renewal applications for the period of April 1, 2019 through March 31, 2020, each for a Restaurant Liquor License in the Office of Town Clerk of Pinedale, Pinedale, Wyoming.  The date of filing, the names of said applicants and the street address which the applicants desire to use as the place of sale are set forth below as follows:

Date of Filing December 05, 2018     

Applicant Wind River Brewing Company, Inc., DBA Wind River Brewing Company

Address 402 West Pine 402 West Pine

Protests, if any there be any against the issuance of each and every license will be heard at the hour of 6 P.M. on the 25tth day of February, 2019 in the Sublette County Commissioner’s Room, 21 S. Tyler, Pinedale, Wyoming.

Public Notice #7785 published in the Pinedale Roundup on February 15, 22, 2019

Notice is hereby given that the applicants whose names are set forth below filed renewal applications for the period April 1, 2019 through March 31, 2020, each for a Retail Liquor License in the Office of the Town Clerk of Pinedale, Pinedale, Wyoming.  The date of filing, the names of said applicants, and the street addresses which the applicants desire to use as the place of sale are set forth below as follows:

Date of Filing January  01, 2019

Applicant Bourbon Ridge Holdings Inc.;  DBA Country Lane Liquor

Address 1190 West Pine

Protests, if any there be any against the issuance of each and every license will be heard at the hour of 6 P.M. on the 25tth day of February, 2019 in the Sublette County Commissioner’s Room, 21 S. Tyler, Pinedale, Wyoming.

Public Notice #7786 published in the Pinedale Roundup on February 15, 22, 2019

Department of Environmental Quality, Division of Air Quality PUBLIC NOTICE:  In accordance with Chapter 6, Section 2(m) of the Wyoming Air Quality Standards and Regulations, notice is hereby given that the State of Wyoming, Department of Environmental Quality, Division of Air Quality, proposes to approve a request by Andeavor Gathering I LLC to modify the Stewart Point 14-20 PAD (F026783) with the removal of one (1) 40 million cubic feet per day (MMCFD) triethylene glycol (TEG) dehydration unit and associated equipment, with one reboiler overheads condenser and one smokeless combustion device to control volatile organic compound and hazardous air pollutant emissions associated with the dehydration unit and pneumatic pump, located in the SE1/4SW1/4 of Section 20, T33N, R109W, approximately four (4) miles south-southwest of Pinedale, in Sublette County, Wyoming.  Andeavor Gathering I, LLC has met the demonstration requirements under Chapter 6, Section 2(c)(ii) for this permitting action since current emissions are less than emissions during the baseline period.  VOC emissions have decreased 3.4 TPY from the baseline period and NOx emissions have decreased 2.5 TPY from the baseline period.  These reductions have been added to Andeavor Gathering I, LLC’s offset bank to use for future permitting actions.

For the duration of the public comment period, the permit application, the agency’s analysis, and the public notice are available for public inspection online at https://openair.wyo.gov, utilizing facility ID F026783 and permit number P0025525 under permits. This material may also be viewed online, at the above URL, utilizing a public computer at the Sublette County Library, Pinedale, Wyoming.  Additionally, for the duration of the public comment period a copy of this public notice is available for public inspection at the Sublette County Clerk’s Office, Pinedale, Wyoming.  In accordance with the Americans with Disabilities Act, special assistance or alternate formats will be made available upon request for individuals with disabilities.

Written comments may be directed to Nancy Vehr, Administrator, Division of Air Quality, Department of Environmental Quality, 200 West 17th St., Cheyenne, Wyoming 82002 or by fax (307) 635-1784.  Please reference A0007891 in your comment.  Comments submitted by email will not be included in the administrative record.  All comments received by 5:00 p.m., Monday, March 25, 2019 will be considered in the final determination on this application.  A public hearing will be conducted only if in the opinion of the administrator sufficient interest is generated or if an aggrieved party so requests.

Public Notice #7789 published in the Pinedale Roundup on February 22, 2019

Department of Environmental Quality, Division of Air Quality PUBLIC NOTICE:  In accordance with Chapter 6, Section 2(m) of the Wyoming Air Quality Standards and Regulations, notice is hereby given that the State of Wyoming, Department of Environmental Quality, Division of Air Quality, proposes to approve a request by Andeavor Gathering I LLC to modify the Mesa 6-7 PAD (F026781) with the removal of one (1) 24 million cubic feet per day (MMCFD) triethylene glycol (TEG) dehydration unit and associated equipment, with one reboiler overheads condenser, one TEG flash tank separator and one smokeless combustion device to control volatile organic compound and hazardous air pollutant emissions associated with the dehydration unit, located in the SE1/4NW1/4 of Section 7, T32N, R109W, approximately seven (7) miles south of Pinedale, in Sublette County, Wyoming.  Andeavor Gathering I, LLC has met the demonstration requirements under Chapter 6, Section 2(c)(ii) for this permitting action since current emissions are less than emissions during the baseline period.  VOC emissions have decreased 2.3 TPY from the baseline period and NOx emissions have decreased 1.3 TPY from the baseline period.  These reductions have been added to Andeavor Gathering I, LLC’s offset bank to use for future permitting actions.

For the duration of the public comment period, the permit application, the agency’s analysis, and the public notice are available for public inspection online at https://openair.wyo.gov, utilizing facility ID F026781 and permit number P0025528 under permits. This material may also be viewed online, at the above URL, utilizing a public computer at the Sublette County Library, Pinedale, Wyoming.  Additionally, for the duration of the public comment period a copy of this public notice is available for public inspection at the Sublette County Clerk’s Office, Pinedale, Wyoming.  In accordance with the Americans with Disabilities Act, special assistance or alternate formats will be made available upon request for individuals with disabilities.

Written comments may be directed to Nancy Vehr, Administrator, Division of Air Quality, Department of Environmental Quality, 200 West 17th St., Cheyenne, Wyoming 82002 or by fax (307) 635-1784.  Please reference A0007894 in your comment.  Comments submitted by email will not be included in the administrative record.  All comments received by 5:00 p.m., Monday, March 25, 2019 will be considered in the final determination on this application.  A public hearing will be conducted only if in the opinion of the administrator sufficient interest is generated or if an aggrieved party so requests.

Public Notice #7790 published in the Pinedale Roundup on February 22, 2019

ADVERTISEMENT FOR PROPOSAL

PROJECT: SUBLETTE COUNTY SCHOOL DISTRICT # 1 NETWORK HARDWARE

OWNER:

Sublette County School District # 1

665 N Tyler Ave.

P.O. Box 549

Pinedale, Wyoming 82941

BID DATE: March 18, 2019

BID TIME: Time 4:00 PM MT

Sublette County School District # 1 in Pinedale, WY is seeking to replace network switches.  Bids will be received at the Sublette County School District # 1 Business Office located at 665 N. Tyler Ave., in Pinedale, WY 82941.

RESPONSES WILL BE OPENED 4:00 P.M., Monday March 18, 2019, in the Board Room.  LATE SUBMISSIONS WILL NOT BE ACCEPTED.

Request for Proposal criteria and specifications, construction drawings and details may be obtained from the District’s website at http://www.sub1.org/business-finance-89ce0f2d or by contacting the Business Office.  Questions pertaining to the project should be directed to Chris Rule. The District shall not be responsible for any oral instructions. Any changes to the RFP will be in the form of an addendum, which will be furnished to all registered RFP holders.

All bids will be evaluated pursuant to Wyoming State Statues 16-6-102 Resident Contractors; 16-6-203, Resident Labor; and Wyoming State Statutes Chapter 16, Article 7 on Construction Contracts.  In addition, pursuant to Wyoming State Statues 16-6-104, and 16-6-106, preference is hereby given to materials, supplies, equipment, machinery and provisions produced, manufactured, supplied or grown in Wyoming, quality being equal to articles offered by the competitors outside of the state.

The District reserves the right to waive irregularities and informalities in the bidding or in any bid, reject any or all bids without further obligation and to accept any bid deemed in the best interest of Sublette County School District # 1. The District does not bind itself in any way to accept the low bid.  All proposals will be evaluated as outlined in the bid documents.

Public Notice #7791 published in the Pinedale Roundup on February 22, 2019

IN THE DISTRICT COURT IN AND FOR SUBLETTE COUNTY, WYOMING NINTH JUDICIAL DISTRICT

JOHN WAYNE BELL, )

Plaintiff, )

  1. )

ESTATE OF MITCHELL L. SHIELDS, SR.,) ESTATE OF TOMIKO SHIELDS, and  STEVEN A. SHIELDS, )

Defendants.

Civil Action No. 8649

LEGAL NOTICE

TO: STEVEN A. SHIELDS

Address Unknown

TAKE NOTICE that John Wayne Bell, has filed a Complaint in the District Court, Ninth Judicial District, Sublette County, Wyoming to quiet title to:

Lot 5 of Prospector Square, First Filing, Sublette County, Wyoming, as the same appears of record on the official plat thereof recorded in the office of the County Clerk, Sublette County, Wyoming.

Together with all improvements and appurtenances thereto appertaining. Subject to covenants, reservations and restrictions of record, including those contained in instrument recorded June 20, 1978, in Book 34 of Miscellaneous, Page 165.

Subject to easements and rights of way ofrecord or in use.

as fee simple owner of said real property naming you as Defendant, alleging that you claim estates, rights, titles, liens and interests which are adverse to those of the Plaintiff, and that Plaintiff is seeking to have his title to said real property forever quieted and a judicial determination that you have no estates, rights, titles, liens or interests therein.

FURTHER, you are notified that you are required to answer Plaintiffs Complaint on or before April 15, 2019 by filing the same with the Clerk of this Court; otherwise, said Complaint shall be taken as true and judgment shall be rendered against you accordingly.

Janet Montgomery

Clerk of District Court

Public Notice #7792 published in the Pinedale Roundup on February 22, March 1, 8, 15, 2019

Notice of Proposed Wyoming Department of Environmental Quality Underground Injection Control Permit

The Wyoming Department of Environmental Quality (WDEQ) Underground Injection Control (UIC) Program regulates certain discharges of pollutants into groundwaters of the state.  Operators of these discharges are required to receive coverage under a UIC permit.  The purpose of this notice is to inform the public that the UIC Program is proposing the issuance of a new permit (#18-205) for NGL Water Solutions, LLC, Injection wells Boulder 7-21 WDW4, Boulder 8-21 WDW5, Boulder 1-21 WDW6, and Boulder 13-22 WDW 7.  The applicant proposes to inject non-hazardous wastes, primarily associated with the exploration, development, or production of crude oil or natural gas. The permit applicant is NGL Water Solutions, LLC, 3773 Cherry Creek North Drive, Suite 1000, Denver, CO 80209.  The facility is located in Section 21 and Section 22, Township 31 North, Range 108 West, of the Sixth Principal Meridian, Sublette County, WY.

The public comment period begins on February 22, 2019 and ends March 25, 2019. WDEQ has prepared a supplemental on-line public notice that is available at the WDEQ’s website (http://deq.wyoming.gov/).  The website provides electronic access to a copy of the proposed permit.  You may also obtain copies of the draft permit, statement of basis, the permit application, or additional information by contacting Laurel Morrow, Wyoming Department of Environmental Quality, Water Quality Division, 200 West 17th Street, Cheyenne, WY 82002 or by email at laurel.morrow@wyo.gov. 

During the thirty (30) day public comment period, any interested person may submit in writing, comments on the draft permit and may request that a public hearing be held. Requests for a public hearing should indicate the name and full mailing address of the individual requesting a hearing, the interest that individual has in the project, and the grounds for holding a public hearing.  All written comments and requests received prior to 5:00 P.M., March 25, 2019 in the Cheyenne office will be considered.  Comments submitted by email will not be considered.  Written comments should be directed to John Passehl, P.G., Geology Supervisor, Department of Environmental Quality, Water Quality Division, 200 West 17th Street, Cheyenne, WY 82002 or by fax at 307-635-1784.

Public Notice #7793 published in the Pinedale Roundup on February 22, 2019